Our navigation station is taking shape...

The cabinets are dry-fitted before finishing in the house where it's warmer. The far left opening is for our computer with the SSB on top, the middle one will house the radios, electrical panels will reside in the far right opening. The holes there are for the propane plumbing, the tanks being just on the other side in a wing deck box.

Our radar panel will hang from the corner thingy above the chart table. It will be on some sort of arm or track that will extend so we can see it from the cockpit.

The countertop next to the seat lifts up to reveal storage for pencils, chart tools, calculator, etc.

Below, the hull side and around opening port are covered in sheet cork. Electrical panels and things are being installed.

This is the galley area with the sink and countertop before the final finish sealer on the mahogany top. The foot pump is installed for pumping fresh or salt water, depending on our preference.

The sink is the largest Scandvik SS sink we could fit into the space. We hung it under the counter for that extra bit of depth. It sure will be interesting trying to wash our big wok!

Wiring has been run to the overhead for small halogen recessed lights. We have undercabinet fluorescent lighting here and on the starboard side.

First of the Upholstery

This site, copy and photographs copyright Nina Courtney.