Most of the deck hardware is installed. We have our stanchions and lifelines, too, but uninstalled them after we made sure of the fit. We've stored them in the deck bins for later installation after we move the boat this Spring 2004.

It is too cold to install the Lexan fixed portlights, though we have the pieces ready to go in.

This is our bow roller. It is rather chunky so I wanted to disguise it a bit with the platform. I think it helps a bit.

The brass opening let into the platform is for getting to the chainplate bolts, if need be.

The Stern & Chainlocker...

This site, copy and photographs copyright Nina Courtney.